Foamed-filled tires
*Small order < 20-30kg will be delivered by EMS, deliver time need 4-9 days .
*>100 pieces, will be delivered by Ocean shipment.
*One CBM contains 325 pieces 2.80/2.50-4 tires
*FOB/ CIF/ DDU please inquiry first
*Ocean Shipment need 7-45 days to arrive, depending on the arrival port.
Giriş
Kaohsiung
Tedarik Kapasitesi
Tedarik Kapasitesi
2000 Adet / Adet per Month
Tedarikçinin ürün açıklamaları
>= 150 Adet
$17,50
Miktar
Nakliye
Seçilen miktar için gönderim çözümleri şu anda mevcut değil